London Fire Brigade

Purley crews move into brand new station

18 March 2016

Purley’s fire crews have begun operating from their new state-of-the-art fire station.

Located on the existing Brighton Road site, the brand new building replaces the old station and will provide firefighters with modern facilities that meet the demands of a 21st century fire and rescue service.

It includes two larger appliance bays which are better able to accommodate the Brigade’s latest vehicles, a four storey drill tower for training, offices and meeting rooms, a gym, lecture and quiet study rooms and a kitchen and dining area for firefighters. There are separate shower, changing and resting areas that can be modified to accommodate the different male to female ratio on each watch.

The rebuilt station includes areas the public can visit to access important fire safety information, as well as a community room which will be available for bookings.

One of nine fire stations set to be rebuilt

The construction project was part of the Brigade’s on-going Private Finance Initiative (PFI) programme that will eventually see nine of London’s fire stations coming to the end of their life-span replaced by brand new buildings.

Building work on the new Purley station began in March 2015 and was carried out by the Brigade’s PFI delivery partner Blue3 (a Kier led consortium).

During the construction phase of the project Purley’s firefighters and appliances operated out of Mitcham Fire Station.

Purley’s Borough Commander, Sally Cartwright, said:

"This brand new fire station has improved facilities for our firefighters and includes an excellent resource for the local community to access. The previous station had served the community well for many years but was coming to the end of its working life and no longer met the demands of a modern fire and rescue service.

"This fantastic new station provides us with facilities fit for the 21st century and reinforces our commitment to providing the best possible fire service to the people of Purley and Croydon and to London as a whole.”

Embracing an environmentally friendly approach

The design of the new fire station meets the highest environmental standards, as well as providing a high level of natural light, the building draws energy for power and heating from renewable sources including a combined heat and power unit and solar panels. The building also reduces energy and water demands, cutting running costs and contributing to the Brigade’s overall environmental performance.